PRELIMINARY REVIEW
  • Review of Flow Conditions and Requirements.
  • Review of System Pressure Ratings and Supply.
  • Review of Output and Control Requirements.
  • Review Overpressure Equipment Specifications
DOCUMENTATION
  • Complete Documentation of Flow Calculations 
  • Equipment Selection Criteria
  • Drawings both Paper and Electronic ACAD & others.
INSPECTION
  • Regulation, Flow Control, or Pressure Control Systems
  • Inspection  and Start-up.
  • As built drawings and Digitized Pictures
COMPLETE FABRICATION & ASSEMBLY
  • Piping to 24” and Pressure ratings to ANSI 2500#.
  • API 1104 Testing and Specs. , ASME  Available.
  • Skid mounting with Enclosures.
REPLACEMENT or UPGRADES
  • EGM & Communications
  • Measurement Equipment
  • Recording Devices
OTHER SERVICES
  • Gas Quality:   Analysis
  • On-Site Startup of Regulator Systems
  • Measurement System Auditing 
  • Pulsation Tests
  • Chart & EFM Auditing
  • Meter Calibration
  • Witnessing



Back to Top